Some key insights from the article:
Basically, what they did was to look at how much batteries would be needed in a given area to provide constant power supply at least 97% of the time, and the calculate the costs of that solar+battery setup compared to coal and nuclear.
Ok, current projections are still for the next two AP1000s at Vogtle to be something like $10 billion. That’s just not cost competitive with solar/wind. And it’s also not very realistic to assume that there won’t be cost overruns on the next one, either. Complex engineering projects tend to run over.
Next two? After you mentioned it I tried googling and can’t find anything about current projections for new AP1000s at vogtle.