Some key insights from the article:

Basically, what they did was to look at how much batteries would be needed in a given area to provide constant power supply at least 97% of the time, and the calculate the costs of that solar+battery setup compared to coal and nuclear.

  • booly@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    1
    ·
    7 hours ago

    Ok, current projections are still for the next two AP1000s at Vogtle to be something like $10 billion. That’s just not cost competitive with solar/wind. And it’s also not very realistic to assume that there won’t be cost overruns on the next one, either. Complex engineering projects tend to run over.

    • BussyCat@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      7 hours ago

      Next two? After you mentioned it I tried googling and can’t find anything about current projections for new AP1000s at vogtle.